Dr. Jonathan Kramer's Cell Tower Photo Gallery

Copyright 2000-2023 Dr. Jonathan Kramer


DSCN8496.JPG
The Transit Mixer has Arrived...545 views...so let the pouring begin!00000
(0 votes)
DSCN8495.JPG
Light Standard Under Construction503 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.33333
(2 votes)
DSCN8492.JPG
Not part of an underground water river...555 viewsThe water bottle is not part of the CEV. 00000
(2 votes)
DSCN8494.JPG
CEV ready for concrete pour480 viewsJust waiting on the transit mixer to show up.33333
(2 votes)
DSCN8493.JPG
Nearly time for the 'crete!429 viewsWorkers preparing the CEV for the concrete pour.00000
(0 votes)
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.504 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.11111
(2 votes)
DSCN8490.JPG
Cable route in/out of the CEV476 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.22222
(2 votes)
DSCN8488.JPG
Looking at the rear of the CEV.482 viewsA good shot of the base and read of the CEV dig hole.11111
(1 votes)
DSCN8489.JPG
Light Standard Under Construction581 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.55555
(2 votes)
DSCN8486.JPG
Verizon CEV installation in Irvine, California615 views55555
(2 votes)
DSCN8487.JPG
Verizon CEV installation in Irvine, California658 viewsWorkers preping the CEV for the concrete pour.00000
(1 votes)
 
11 files on 1 page(s)