Dr. Jonathan Kramer's Cell Tower Photo Gallery

Copyright 2000-2023 Dr. Jonathan Kramer

Don't worry...the ladder will be removed before the concrete is poured.
Workers preping the CEV for the concrete pour.  The large holes are to connect to what will be intake and outflow air vents yet to be installed.
Keywords: Verizon CEV installation Irvine light standard double arm radome

Don't worry...the ladder will be removed before the concrete is poured.

Workers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.

DSCN8491.JPG
Rate this file (Current rating : 1 / 5 with 2 votes)
Rollover to rate this picture