Dr. Jonathan Kramer's Cell Tower Photo Gallery

Copyright 2000-2023 Dr. Jonathan Kramer

Click to view full size image

03 - Trunk Installed

The "trunk" of the cell pine is installed on the concrete base. Note the pegs used to receive the branches, and the cable portal at the top of the trunk.

02-405.jpg
Rate this file (Current rating : 2.5 / 5 with 10 votes)