|
Don't worry...the ladder will be removed before the concrete is poured.
|
Workers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
|
|
Rate this file (Current rating : 1 / 5 with 2 votes) |
|
|