BTS cabinets during installation - Cable ladder rack854 viewsThis is a photo of the BTS (Base Telecommunications Station) cabinets during installation. Notice the cable ladder rack connecting the BTS cabinets to the trunk of the tree. The coaxial cables will be lashed to this ladder for physical support.
The Transit Mixer has Arrived...529 views...so let the pouring begin!
Light Standard Under Construction486 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
Not part of an underground water river...534 viewsThe water bottle is not part of the CEV.
CEV ready for concrete pour458 viewsJust waiting on the transit mixer to show up.
Nearly time for the 'crete!412 viewsWorkers preparing the CEV for the concrete pour.
Don't worry...the ladder will be removed before the concrete is poured.484 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
Cable route in/out of the CEV456 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
Looking at the rear of the CEV.462 viewsA good shot of the base and read of the CEV dig hole.
Light Standard Under Construction562 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
Verizon CEV installation in Irvine, California596 views
Verizon CEV installation in Irvine, California636 viewsWorkers preping the CEV for the concrete pour.
Installing a cell palm879 viewsI snapped this photograph during the installation of this cell palm tree along the I-405 in the pass connecting the San Fernando Valley and West Los Angeles.