DSCN8496.JPG
The Transit Mixer has Arrived...546 views...so let the pouring begin!
DSCN8495.JPG
Light Standard Under Construction504 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
DSCN8492.JPG
Not part of an underground water river...556 viewsThe water bottle is not part of the CEV.
DSCN8494.JPG
CEV ready for concrete pour481 viewsJust waiting on the transit mixer to show up.
DSCN8493.JPG
Nearly time for the 'crete!430 viewsWorkers preparing the CEV for the concrete pour.
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.505 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
DSCN8490.JPG
Cable route in/out of the CEV477 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
DSCN8488.JPG
Looking at the rear of the CEV.483 viewsA good shot of the base and read of the CEV dig hole.
DSCN8489.JPG
Light Standard Under Construction582 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
DSCN8486.JPG
Verizon CEV installation in Irvine, California616 views
DSCN8487.JPG
Verizon CEV installation in Irvine, California659 viewsWorkers preping the CEV for the concrete pour.
 