![](images/icons/search.png) Image search results - "cev"
|
![Filename=cells_ucla_hilgard_manning_vzw_row_20080820_DSCN9709.jpg
Filesize=2440KiB
Dimensions=1956x1439
Date added=Jan 03, 2009 cells_ucla_hilgard_manning_vzw_row_20080820_DSCN9709.jpg](albums/ftp-santafenm2008/thumb_cells_ucla_hilgard_manning_vzw_row_20080820_DSCN9709.jpg)
UCLA? I C LA!626 viewsVerizon's right-of-way microcell monopole site on Hilgard Avenue near Manning just to the east of UCLA. The base station equipment is located underground adjacent to the two vents.
|
|
![Filename=DSCN8496.JPG
Filesize=2351KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8496.JPG](albums/ftp-cev/thumb_DSCN8496.JPG)
The Transit Mixer has Arrived...545 views...so let the pouring begin!
|
|
![Filename=DSCN8495.JPG
Filesize=2165KiB
Dimensions=1536x2048
Date added=Nov 18, 2007 DSCN8495.JPG](albums/ftp-cev/thumb_DSCN8495.JPG)
Light Standard Under Construction503 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
|
|
![Filename=DSCN8492.JPG
Filesize=2265KiB
Dimensions=1536x2048
Date added=Nov 18, 2007 DSCN8492.JPG](albums/ftp-cev/thumb_DSCN8492.JPG)
Not part of an underground water river...555 viewsThe water bottle is not part of the CEV.
|
|
![Filename=DSCN8494.JPG
Filesize=2525KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8494.JPG](albums/ftp-cev/thumb_DSCN8494.JPG)
CEV ready for concrete pour480 viewsJust waiting on the transit mixer to show up.
|
|
![Filename=DSCN8493.JPG
Filesize=2342KiB
Dimensions=1536x2048
Date added=Nov 18, 2007 DSCN8493.JPG](albums/ftp-cev/thumb_DSCN8493.JPG)
Nearly time for the 'crete!429 viewsWorkers preparing the CEV for the concrete pour.
|
|
![Filename=DSCN8491.JPG
Filesize=2943KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8491.JPG](albums/ftp-cev/thumb_DSCN8491.JPG)
Don't worry...the ladder will be removed before the concrete is poured.504 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
|
|
![Filename=DSCN8490.JPG
Filesize=2428KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8490.JPG](albums/ftp-cev/thumb_DSCN8490.JPG)
Cable route in/out of the CEV476 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
|
|
![Filename=DSCN8488.JPG
Filesize=2453KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8488.JPG](albums/ftp-cev/thumb_DSCN8488.JPG)
Looking at the rear of the CEV.482 viewsA good shot of the base and read of the CEV dig hole.
|
|
![Filename=DSCN8489.JPG
Filesize=2316KiB
Dimensions=1536x2048
Date added=Nov 18, 2007 DSCN8489.JPG](albums/ftp-cev/thumb_DSCN8489.JPG)
Light Standard Under Construction581 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
|
|
![Filename=DSCN8486.JPG
Filesize=2306KiB
Dimensions=2048x1536
Date added=Nov 18, 2007 DSCN8486.JPG](albums/ftp-cev/thumb_DSCN8486.JPG)
Verizon CEV installation in Irvine, California615 views
|
|
![Filename=DSCN8487.JPG
Filesize=2124KiB
Dimensions=1536x2048
Date added=Nov 18, 2007 DSCN8487.JPG](albums/ftp-cev/thumb_DSCN8487.JPG)
Verizon CEV installation in Irvine, California658 viewsWorkers preping the CEV for the concrete pour.
|
|
![Filename=cells.topark.thousandoaks.bts.pmbs.cingular.20050913.P9130109.jpg
Filesize=1145KiB
Dimensions=2139x1474
Date added=Sep 14, 2005 cells.topark.thousandoaks.bts.pmbs.cingular.20050913.P9130109.jpg](albums/ftp-camo/thumb_cells.topark.thousandoaks.bts.pmbs.cingular.20050913.P9130109.jpg)
Field of Signals422 viewsCingular's dual CEV site at Thousand Oaks Park in Thousand Oaks, California. Notice the GPS/LMU antenna bolted to the side of the CEV in the foreground.
|
|
![Filename=cells.cev.bench.P1020038.jpg
Filesize=983KiB
Dimensions=2199x1605
Date added=Jan 04, 2005 cells.cev.bench.P1020038.jpg](albums/userpics/10001/thumb_cells.cev.bench.P1020038.jpg)
CEV Hatch with Bench715 viewsThe metal bench sits atop the hatch of a CEV (controlled environmental vault) used to house telecommunications equipment in a large, underground room. How large is large, you ask? CEV's are common, but bench tops aren't.
CEVs come in many sizes, but its common for the size of the room below ground to be measured in hundreds of square feet.
|
|
|
|