Dr. Jonathan Kramer's Cell Tower Photo Gallery

Copyright 2000-2023 Dr. Jonathan Kramer

15. Clock Tower Painting Underway
The panels are fully installed and are being painted and textured to match the building.
Keywords: verizon armacost

15. Clock Tower Painting Underway

The panels are fully installed and are being painted and textured to match the building.

armacost015.jpg
Rate this file (Current rating : 0.3 / 5 with 3 votes)