Dr. Jonathan L. Kramer's Cell Tower Photo Gallery

Copyright 2000-2026 Dr. Jonathan Kramer

Picture has been added to favorites
15. Clock Tower Painting Underway
The panels are fully installed and are being painted and textured to match the building.
Keywords: verizon armacost

15. Clock Tower Painting Underway

The panels are fully installed and are being painted and textured to match the building.

armacost015.jpg
Rate this file (Current rating : 0.3 / 5 with 3 votes)