Light Standard Under Construction566 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway. (2 votes)
Verizon CEV installation in Irvine, California601 views (2 votes)
Light Standard Under Construction488 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. (2 votes)
CEV ready for concrete pour465 viewsJust waiting on the transit mixer to show up. (2 votes)
Cable route in/out of the CEV461 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard. (2 votes)
Don't worry...the ladder will be removed before the concrete is poured.487 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed. (2 votes)
Looking at the rear of the CEV.466 viewsA good shot of the base and read of the CEV dig hole. (1 votes)
Not part of an underground water river...539 viewsThe water bottle is not part of the CEV. (2 votes)
Verizon CEV installation in Irvine, California640 viewsWorkers preping the CEV for the concrete pour. (1 votes)