DSCN8496.JPG
The Transit Mixer has Arrived...309 views...so let the pouring begin!00000
(0 votes)
DSCN8495.JPG
Light Standard Under Construction260 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.33333
(2 votes)
DSCN8492.JPG
Not part of an underground water river...326 viewsThe water bottle is not part of the CEV. 00000
(2 votes)
DSCN8494.JPG
CEV ready for concrete pour253 viewsJust waiting on the transit mixer to show up.33333
(2 votes)
DSCN8493.JPG
Nearly time for the 'crete!225 viewsWorkers preparing the CEV for the concrete pour.00000
(0 votes)
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.276 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.11111
(2 votes)
DSCN8490.JPG
Cable route in/out of the CEV246 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.22222
(2 votes)
DSCN8488.JPG
Looking at the rear of the CEV.240 viewsA good shot of the base and read of the CEV dig hole.11111
(1 votes)
DSCN8489.JPG
Light Standard Under Construction317 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.55555
(2 votes)
DSCN8486.JPG
Verizon CEV installation in Irvine, California349 views55555
(2 votes)
DSCN8487.JPG
Verizon CEV installation in Irvine, California430 viewsWorkers preping the CEV for the concrete pour.00000
(1 votes)
 