|
|

The Transit Mixer has Arrived...565 views...so let the pouring begin!     (0 votes)
|
|

Light Standard Under Construction521 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.     (2 votes)
|
|

Not part of an underground water river...575 viewsThe water bottle is not part of the CEV.      (2 votes)
|
|

CEV ready for concrete pour499 viewsJust waiting on the transit mixer to show up.     (2 votes)
|
|

Nearly time for the 'crete!446 viewsWorkers preparing the CEV for the concrete pour.     (0 votes)
|
|

Don't worry...the ladder will be removed before the concrete is poured.522 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.     (2 votes)
|
|

Cable route in/out of the CEV492 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.     (2 votes)
|
|

Looking at the rear of the CEV.499 viewsA good shot of the base and read of the CEV dig hole.     (1 votes)
|
|

Light Standard Under Construction597 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.     (2 votes)
|
|

Verizon CEV installation in Irvine, California640 views     (2 votes)
|
|

Verizon CEV installation in Irvine, California678 viewsWorkers preping the CEV for the concrete pour.     (1 votes)
|
|
|
|
|