Light Standard Under Construction610 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.55555
(2 votes)
DSCN8486.JPG
Verizon CEV installation in Irvine, California654 views55555
(2 votes)
DSCN8495.JPG
Light Standard Under Construction536 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.33333
(2 votes)
DSCN8494.JPG
CEV ready for concrete pour515 viewsJust waiting on the transit mixer to show up.33333
(2 votes)
DSCN8490.JPG
Cable route in/out of the CEV506 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.22222
(2 votes)
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.539 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.11111
(2 votes)
DSCN8488.JPG
Looking at the rear of the CEV.512 viewsA good shot of the base and read of the CEV dig hole.11111
(1 votes)
DSCN8492.JPG
Not part of an underground water river...591 viewsThe water bottle is not part of the CEV. 00000
(2 votes)
DSCN8487.JPG
Verizon CEV installation in Irvine, California699 viewsWorkers preping the CEV for the concrete pour.00000
(1 votes)