Jonathan Kramer's Cell Tower Photo Gallery

Our collection of wireless sites

Image search results - "double"
DSCN8496.JPG
The Transit Mixer has Arrived...317 views...so let the pouring begin!
DSCN8495.JPG
Light Standard Under Construction269 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed.
DSCN8492.JPG
Not part of an underground water river...335 viewsThe water bottle is not part of the CEV.
DSCN8494.JPG
CEV ready for concrete pour261 viewsJust waiting on the transit mixer to show up.
DSCN8493.JPG
Nearly time for the 'crete!232 viewsWorkers preparing the CEV for the concrete pour.
DSCN8491.JPG
Don't worry...the ladder will be removed before the concrete is poured.283 viewsWorkers preping the CEV for the concrete pour. The large holes are to connect to what will be intake and outflow air vents yet to be installed.
DSCN8490.JPG
Cable route in/out of the CEV254 viewsThis trench will house the power and telephone cable conduits into and out of the CEV, as well as the coaxial cables to the base of the light standard.
DSCN8488.JPG
Looking at the rear of the CEV.248 viewsA good shot of the base and read of the CEV dig hole.
DSCN8489.JPG
Light Standard Under Construction327 viewsThe double arms of this light standard, and the radome containing the antennas above the arms are yet to be placed. The light standard is located in the greenbelt median of the roadway.
DSCN8486.JPG
Verizon CEV installation in Irvine, California360 views
DSCN8487.JPG
Verizon CEV installation in Irvine, California438 viewsWorkers preping the CEV for the concrete pour.
 
11 files on 1 page(s)